Apex Manufacturing Plant

Tijuana, MX — Cell A

LIVE DATA
LL

Equipment

Equipment Status

7 assets monitored. 2 machines down, 1 starved — together they account for 53 min of unplanned downtime.

Running

4

Idle

1

Down

2

Machine 01

CNC Milling · Line 01

RUNNING
OEE
88.2%
Cycle
40.8s
Down
4m
Units
1,580

1,580 / 1,600 units · operator R. Delgado

Machine 02

Press Assembly · Line 01

RUNNING
OEE
82.7%
Cycle
41.9s
Down
11m
Units
1,540

1,540 / 1,600 units · operator L. Ibarra

Machine 03

Torque Station · Line 01

IDLE
OEE
64.1%
Cycle
43.4s
Down
18m
Units
1,210

1,210 / 1,600 units · operator J. Márquez

Waiting on upstream material

Machine 04

Robotic Weld · Line 02

DOWN
OEE
51.3%
Cycle
48.2s
Down
31m
Units
980

980 / 1,600 units · operator A. Fuentes

Tool change overrun — spindle 2

Machine 05

Leak Test · Line 02

RUNNING
OEE
84.5%
Cycle
42.1s
Down
7m
Units
1,500

1,500 / 1,600 units · operator M. Cordero

Machine 06

Vision Inspection · Line 03

RUNNING
OEE
86.9%
Cycle
41.2s
Down
5m
Units
1,560

1,560 / 1,600 units · operator S. Peña

Machine 07

Packaging · Line 03

DOWN
OEE
58.4%
Cycle
46.7s
Down
22m
Units
1,050

1,050 / 1,600 units · operator D. Rangel

Material jam at infeed conveyor

Asset Matrix

Sorted by OEE — lowest performers first

AssetProcessLineStatusOEECycleDowntimeUnits
Machine 04Robotic WeldLine 02DOWN51.3%48.2s31 min980
Machine 07PackagingLine 03DOWN58.4%46.7s22 min1,050
Machine 03Torque StationLine 01IDLE64.1%43.4s18 min1,210
Machine 02Press AssemblyLine 01RUNNING82.7%41.9s11 min1,540
Machine 05Leak TestLine 02RUNNING84.5%42.1s7 min1,500
Machine 06Vision InspectionLine 03RUNNING86.9%41.2s5 min1,560
Machine 01CNC MillingLine 01RUNNING88.2%40.8s4 min1,580