Apex Manufacturing Plant

Tijuana, MX — Cell A

LIVE DATA
LL

Production

Production Performance

Actual vs planned output across the shift. Losses started at 18:00 when Machine 04 went down.

Production

-580 units

8,420/ 9,000 units

Target 9,000 units6.4% behind shift plan

OEE

-6.6 pts

78.4%

Target 85.0%Availability is the main drag

Cycle Time

+1.6 sec

42.6sec

Target 41.0 secMachine 07 running slow

Production vs Target — Cumulative

The gap opens at 18:00 and never recovers within the shift

Production by Hour

Bars below target are highlighted in red

Actual vs Planned by Hour

Shift B · 8 hour window

Production by Line

Line 02 is 520 units short of plan

Line 01

104.0%

3,120/ 3,000

OEE
86.1%
Yield
98.2%
Scrap
1.8%

Line 02

82.7%

2,480/ 3,000

OEE
71.4%
Yield
94.3%
Scrap
5.7%

Line 03

94.0%

2,820/ 3,000

OEE
77.8%
Yield
97.6%
Scrap
2.4%